top of page
updated 23 October 2026
Read the WaHG Feasibility Study
Explore the WaHG Feasibility Study map:
Local & Regional Plans
This corridor has been studied for decades, and these studies point to the same need. People need safe ways to move around outside of a vehicle, connecting West Lebanon and Hanover.

UPPER VALLEY LAKE SUNAPEE REGIONAL PLANNING COMMISSION TRANSPORTATION PLAN
Adopted 11 January 2022. "Conduct an engineering feasibility study for constructing a separated multi-use path along NH Route 10 from West Lebanon to downtown Hanover."- Tier I Project, Upper Valley Lake Sunapee Regional Planning Commission

NORTH ROUTE 10 CORRIDOR PLAN
Adopted 11 January 2022. "Improve bicycle access along NH Route 10, both within and between communities, including access to transit."

WALK BIKE RIDE LEB City of Lebanon NH
Published June 2022.
Multi-Modal Transportation Needs and Opportunities: "Lack of bicycle access/shoulders on NH
Route 10."
"Sachem-Wilder Dam path - This path would link up with the Bridge St - Wilder Dam trail (spearheaded by Friends of River Park) to
form a key regional connection between West Lebanon and downtown Hanover and bypass of NH Route
10. Potential linkages include the existing utility corridor or a side path along NH 10."
Multi-Modal Transportation Needs and Opportunities: "Lack of bicycle access/shoulders on NH
Route 10."
"Sachem-Wilder Dam path - This path would link up with the Bridge St - Wilder Dam trail (spearheaded by Friends of River Park) to
form a key regional connection between West Lebanon and downtown Hanover and bypass of NH Route
10. Potential linkages include the existing utility corridor or a side path along NH 10."

Hanover Walk Bike Plan
2022 Update
"Hanover should work with Lebanon to develop a separated three season path along the power line right of way to connect to Boston Lot and beyond to West Lebanon."

WEST LEBANON VILLAGE CHARRETTE REPORT
Published in 2020 by VHB

MASCOMA RIVER GREENWAY ACTION PLAN
Published December, 2010 by the City of Lebanon

CONNECTICUT RIVER RECREATION MANAGEMENT PLAN UPPER VALLEY REGION
Published in 2013 by the Connecticut River Joint Commissions

NEW ENGLAND RAIL TRAIL NETWORK MAP
Published in 2019 by the Rails-to-Trails Conservancy

MASCOMA RIVER GREENWAY EXTENSION PLAN
Published in 2019 by Dartmouth Thayer School of Engineering

City of Lebanon Master Plan
Published in 2012, actively under revision in 2024.

HANOVER SUSTAINABILITY MASTER PLAN
Published in 2024

MASCOMA RIVER GREENWAY SURVEY AND COUNT RESULTS
Upper Valley Lake Sunappee Regional Planning Commission published January 26, 2020

CONNECTICUT RIVER CORRIDOR MANAGEMENT PLAN
Published in 1997 by the Connecticut River Joint Commissions

HARTFORD RIVER WALK DESIGN & FEASIBILITY REPORT
Published in 2018 by Thayer School of Engineering

THE WESTBORO RIVERFRONT PARK DESIGN STUDY
Published in 2004 by architecture, engineering, and planning groups.

UPPER VALLEY TRAILS ALLIANCE PEDESTRIAN BICYCLE TRAIL FEASIBILITY STUDY REPORT
Pedestrian / Bicycle Trail
Linking Lebanon, NH and Hartford, VT
via Railroad Bridge over Connecticut River, VHB produced report in 2007
Linking Lebanon, NH and Hartford, VT
via Railroad Bridge over Connecticut River, VHB produced report in 2007
bottom of page